Project Info
- Location: Bhiwandi, Maharashtra
- Category: Architecture, Buildings
- :
Project Details
Capacity : Weaving unit – 124 Looms
Product-mix : 100% cotton yarn dyed shirting weaving unit along with warping and sizing
Built up Area : 11,000 Sq Mts
Installed Power : 2,500 Kw
Water Requirement : 500 m3/day
Man Power : 500 per day
scope of work :
Preparation of machinery layout and master plan
Architectural and Structural designing of all buildings