Project Info
- Location: Kolhapur, Maharashtra
- Category: 1 Textile, 3 Engineering Industries
- Client :
- Capacity : 100,000 Meters/day Processing
- Product-mix : 100% cotton and cotton blends processing of yarn dyed and piece dyed shirting and bottom weights
- Built up Area : 12,000 Sq Mts
- Installed Power : 2000 Kw
- Water Requirement : 1500 m3/day
- Man Power : 600 per Day
Project Details
scope of work Preparation of machinery layout and master plan Architectural and structural designing of all buildings Utility designing – power, water, steam, thermic oil, gas , compressed air, storm water, drainage, STP, ETP, fire fighting BACK
More Project Details
scope of work
- Preparation of machinery layout and master plan
- Architectural and structural designing of all buildings
- Utility designing – power, water, steam, thermic oil, gas , compressed air, storm water, drainage, STP, ETP, fire fighting