Project Info
- Location: Ranjangaon, Maharashtra
- Category: 1 Textile, 3 Engineering Industries
-
Client :
Bombay Dyeing Wider Width Processing unit - Capacity : 80.000 Meter/Day
- Product-mix : 100% cotton and cotton blends for wider width sheeting fabric consists of bleached fabric, Dyed fabric and printed fabric.
- Built up Area : 50,000 Sq Mts
- Installed Power : 2500 Kw
- Water Requirement : 1500 m3/day
- Boiler : 20 Tons/Hr
- Thermopack : 6 Million K Cal
- Man Power : 800 per Day
Project Details
Scope of work Valuation of the unit Shifting of all machines to other location Schedule of dismantling and packing Utility Shifting – boiler, thermopack, compresser, ETP Project Management and site supervision BACK
More Project Details
Scope of work
- Valuation of the unit
- Shifting of all machines to other location
- Schedule of dismantling and packing
- Utility Shifting – boiler, thermopack, compresser, ETP
- Project Management and site supervision